Quzhai Cement was founded in 1997 and has successively built two new dry cement clinker production lines of 2500t/d tons and two 5000t/d tons. In March 2010, Hebei Quzhai Cement Group was established on the basis of Hebei Quzhai Cement Group. Its headquarters is located in Quzhai Industrial Zone, Luquan City. It is a modern large-scale cement enterprise group.

Circulating Fan Renovation Project of Shijiazhuang Quzhai Cement Co., Ltd.
Quzhai Cement actively responded to the national call for energy conservation and environmental protection, and carried out the technical transformation of fan energy conservation. The raw material mill circulating fan of 5000t/d production line was selected as the pilot for bidding. Shanghai Ruichen won the bid and completed the renovation in April 2016 with perfect delivery. The equipment is stable in operation, and the power saving rate is as high as 21.3, which has been unanimously recognized by the senior management of Quzhai Cement Group.
technical reform before and after the comparison of parameters:

RYCHEN


Hebei Quzhai Mine Peak Cement Co., Ltd. High Temperature Fan Renovation Project
Hebei Quzhai Mine Peak Cement was established in 2009. It is a subsidiary of Hebei Quzhai Group. It has two 4000T/D new dry clinker cement production lines. The production line adopts advanced decomposition, calcination and grinding technology at home and abroad, and the process equipment represents the domestic Leading level. Is the top 50 enterprises in Shijiazhuang City, China's top 50 cement enterprises.
Quzhai mine peak cement found that the energy consumption value was on the high side during the preliminary investigation. At the request of mine peak technicians, its high-temperature fan was reformed to reduce energy consumption and improve enterprise benefits on the premise of ensuring no less than the air volume and pressure before the transformation. After the installation of Shanghai Ruichen high-efficiency centrifugal fan was completed in March 2016, after a period of operation, under the premise that the air volume and air pressure are higher than the actual situation before the technological transformation, the power saving rate of the high-temperature fan is still as high as 28.7.
technical reform before and after the comparison of parameters: